Print   

Friday 18 December, 2009

Sunkar Resources PLC

Update on Pilot Plant Test Pr

RNS Number : 3720E
Sunkar Resources PLC
18 December 2009
 

 



18 December 2009


SUNKAR RESOURCES PLC

("Sunkar" or the "Company")


UPDATE ON PILOT PLANT TEST PROGRAMME




Sunkar Resources plc (AIM:SKR) announces an update to the Pilot Plant Test programmes for the production of phosphoric acid from its 17% P2O5 Chilisai Phosphate Rock. 


Further to the announcement made on 28 September 2009, the Company is pleased to announce the publication of a report on phosphoric acid pilot plant tests prepared by Jacobs Engineering Inc. The complete report can be downloaded from the Company's website at www.sunkarresources.com.  


Serik Utegen, CEO, commented: "We are very glad to have obtained the permission of Jacobs to publish their report on our website. Jacobs' results contain data about the ability of Chilisai rock to generate phosphoric acid and phosphate fertilizers."



For further information please contact:


Sunkar Resources

Serikjan Utegen, CEO                        Tel: +44 20 7930 8678

Donald Sinclair, CFO                         Tel: +44 20 7930 8678


Canaccord Adams Limited

Mike Jones                                          Tel: +44 20 7050 6500

Bhavesh Patel 


GMP Securities Europe LLP

Jeremy Wrathall                                  Tel: +44 20 7647 2800

James Cassley


Bankside Consultants

Simon Rothschild                                Tel: +44 20 7367 8888

Louise Mason



Editors Notes


Sunkar Resources plc


 

Sunkar Resources plc commenced mining following its IPO in June 2008. Sunkar's wholly owned subsidiary in Kazakhstan holds the Subsoil Use Contract to the Chilisai Phosphate Rock Deposit in NW Kazakhstan. The contract area is estimated to contain 800 Mt of ore. 


Sunkar's strategy is to build an integrated world class ammoniated phosphate fertiliser project with low operating costs. Sunkar's low cost base derives from its near surface phosphate rock deposit, access to sulphur from the nearby Tengiz oil field and regional long-term marginal priced gas.


The Chilisai Phosphate Rock Deposit is ideally located on a transportation hub that spans the agricultural markets from Western Europe through to China


Jacobs is one of the world's largest and most diverse providers of technical, professional, and construction services. Neither Jacobs nor any person acting on Jacobs' behalf makes any warranty, express or implied, or assumes any liability with respect to any use or reliance on any information, technology, engineering or methods disclosed or discussed in the report. Any forecasts, estimates, projections, opinions or conclusions reached in the report are dependent upon numerous technical and economic conditions over which Jacobs has no control, and which may or may not occur. Reliance upon such opinions or conclusions by any person or entity is at the sole risk of the person or entity relying thereon.


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBGBDDIXBGGCI

Investegate takes no responsibility for the accuracy of the information within the site.


The announcements are supplied by the denoted source. Queries about the content of an announcement should be directed to the source. Investegate reserves the right to publish a filtered set of announcements. NAV, EMM/EPT, Rule 8 and FRN Variable Rate Fix announcements are filitered from this site.



Investegate      © 2012 FE. All rights reserved.