Half-yearly Report
Hambledon Mining PLC
HAMBLEDON MINING PLC
Interim results to 30 June 2009
17 September 2009
Hambledon Mining Plc (“Hambledon” or the “Company”), the AIM listed gold
mining company based in Kazakhstan, announces today its interim results
for the six months to 30 June 2009. No dividend was declared.
Highlights:
-
Interim loss reduced to £1.3m (loss 6 months to 30 June 2008: £3.4m,
loss for year to 31 December 2008: £7.6m).
-
Positive operating cash flow of £0.42m (outflow 6 months to 30 June
2008: £3m, outflow for year to 31 December 2008: £3.9m).
-
Gold production from Sekisovskoye was 9,413 ounces.
-
Second quarter gold production 86% higher than first quarter.
-
Overall production trend continues towards initial design rate.
-
20% processing capacity increase achieved.
-
Spares inventory substantially improved.
-
Capital expenditure amounted to £0.86m.
Enquiries:
|
Hambledon Mining:
|
|
|
|
Telephone +44 (0) 207 233 1462
|
|
Charles Zorab
|
|
|
|
|
|
|
|
|
|
Fairfax I.S. PLC:
|
|
|
|
Telephone +44 (0) 207 598 5368
|
|
Nominated Adviser and Broker
|
|
|
|
|
|
Ewan Leggat
|
|
|
|
|
CHAIRMAN’S STATEMENT
I am pleased to report to shareholders for the six months to 30 June
2009.
Review of 2009 to date
Despite the production problems previously reported which affected the
first half of this year, the Company made a positive cash flow from
operations of £0.42m. The loss for the six months was also reduced
considerably to £1.3m. Considerable capital was spent on the
installation of the new secondary crusher and the construction of the
second tailings storage facility, together amounting to £0.82m while at
the same time, the Company has increased its inventory of spare parts
which will help reduce the amount of down time due to small breakages
etc.
Gold production in the first half was 9,413 ounces and silver 20,447
ounces. For both, second quarter production was considerably higher than
the first quarter and is likely to increase still further in the second
half of the year. As scheduled in the mine plan, the stripping ratio was
high at over 5:1 but will gradually decline after February 2010 as the
pit is mined below surrounding ground level.
Changes made during the first half of the year, principally to the
crushing plant, have increased the processing capacity to some one
million tonnes per year, 20 per cent. above the designed level. Mine
output has similarly been raised by the acquisition of a third excavator
which began operating in the second half of August, allowing mine
production to complement the increased processing capacity. Until now,
overall production has been restrained by unscheduled maintenance and
repair stoppages but we are confident that the changes already made to
the process plant and the build up of spare parts will reduce these
stoppages to more normal levels and allow the potential of the plant to
be fulfilled.
The application for approval by the authorities for the first phase of
underground mine development has been submitted. Images taken from the
submitted plans will be available on the Company’s website, www.hambledon-mining.com.
Outlook
During the final quarter of this year we expect to achieve a further
step change in our performance towards our initial target of 40,000
ounces per year as an average over the life of the open pit mine and to
continue preparations for the underground project which should
eventually bring our annual production to over 100,000 ounces. Cash flow
from operations, already positive in our first half year, is likely to
grow strongly.
George Eccles
16 September 2009
REVIEW OF OPERATIONS
SEKISOVSKOYE
Safety
The first half of the year showed an excellent safety performance with
no major incidents or injuries reported. The company undertakes regular
training and safety programmes to maintain this performance.
Mining
Mining operations were focused in the first half of the year on
development of the ‘Main Pit’. At the end of the period, the pit had
been developed down to the 455 metre level, some 20 metres above
surrounding ground level. The pit will continue to widen until it
reaches the final pit rim at the 435 level, at which point the waste
stripping ratio will be at its highest, around the end of 2009, and will
fall thereafter. The current high level of waste stripping, together
with unsatisfactory performance and long spare part lead times of the
western procured drill rigs and excavators, made it difficult to
maintain sufficient ore production to keep up with the capacity of the
upgraded processing plant. From April until early August the deficit was
met by treating low grade ore, which had the effect of reducing the
average grade treated. To overcome this deficit, a third excavator, a
Kraneks EK 450FS, was purchased which started operating in mid-August.
The addition of this machine and the hire of additional mining trucks
have increased mining volumes by 20 per cent. and thus reduced the
amount of low grade ore that has to be treated. Productivity has also
been increased by the hiring of a mining consultant who has worked with
our operators to introduce best work and maintenance practices to
maximise the utilisation of our equipment.
Construction of the second tailings storage facility progressed during
the first half of the year and is now nearing completion. Due to the
limited capacity of our mining fleet, this construction was carried out
by civil earthworks contractors. The current storage facility, facility
1, was completed in mid 2008, and will be filled by mid 2010.
Construction of the second tailings storage facility was carried out
early as the clay lining cannot be installed during freezing winter
weather. It will provide tailings storage through to the end of 2011,
and construction of a third tailings storage facility will commence in
2010.
Processing
The operation of the processing plant during the first half of the year
showed a step change in performance following the installation of the
new secondary crusher. Output from the plant up to this time had been
restricted by the ability of the crushing circuit to provide sufficient
crushed ore. In addition to the installation of the new crusher, a
contract metallurgist was employed for a period of four months to assist
our local technical staff to improve operating and maintenance practices
and procedures. These two events saw the crushing circuit increase from
producing approximately 50,000 tonnes per month to over 80,000 and the
size of the crushed product reduced from 20 mm to 16 mm. This then
allowed the mills to be operated at a much higher throughput than had
previously been achieved.
At the end of the half year, the process plant was operating at an ore
tonnage throughput some 15 per cent. above the original design
specification, and it is thought that with the replacement of the
tailings line, to be completed later this month, an additional 5 per
cent. can be achieved. Until now, production has been curtailed by
frequent stoppages caused mostly by design failings in the crushing
plant and long lead times for certain spare parts. In late August and
early September we lost some production due to repairs and maintenance
to the bearings of the jaw crusher and mills. The new installations,
improved maintenance practices, and the build up of spare parts shown to
be necessary either by operating experience or known long lead times
should now produce a significant improvement in overall plant
availability.
Metallurgical recovery of gold at 80.4% was below the 92 per cent.
target indicated by testwork but this was influenced by the lower grade
material being fed to the plant, from which a lower recovery is expected.
The plant was enhanced with the commissioning of the tailings thickener
as well as the addition of a third electrowinning cell to the gold
circuit. The former, together with a reduction in cyanide
concentrations, has reduced cyanide costs substantially in recent months.
Underground development
Work in the first half of the year concentrated on producing the
documentation for the first phase of underground development that is
required to obtain government approval to commence underground activity.
This was submitted in August with approval expected toward the end of
2009. A review of the cost and availability of underground mining
equipment has shown that there has been a reduction in price and a
decrease in lead times. It is anticipated that the cash flow from the
open pit operation will have increased to a point in late 2009 where
orders can be placed for equipment to be delivered in early 2010. The
option of an earlier commencement of the development of the surface
decline using mining contractors is being evaluated.
OGNEVKA
Ognevka remains on care and maintenance pending improving industrial
mineral prices. Other options for the use of this versatile plant are
also being considered.
EXPLORATION
Exploration for the first half of the year focused on research of known
gold occurrences in the East Kazakhstan region and evaluation of their
data. In addition, planning of the development of a test pit at
Tserkovka to generate a bulk sample for metallurgical test work was
finalised. It is expected that this will be carried out in September.
Condensed group income statement
Six months ended 30 June 2009
|
|
|
Note
|
|
Six months to
30 June 2009
(unaudited)
£000
|
|
Six months to
30 June 2008
(unaudited)
£000
|
|
Year ended
31 December 2008
(audited)
£000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Revenue
|
|
|
|
5,667
|
|
828
|
|
5,553
|
|
|
Cost of sales
|
|
|
|
(5,300)
|
|
(2,453)
|
|
(7,727)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Gross profit/(loss)
|
|
|
|
367
|
|
(1,625)
|
|
(2,174)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Administrative expenses
|
|
|
|
(1,408)
|
|
(1,686)
|
|
(3,154)
|
|
|
Other operating expenses
|
|
|
|
|
|
|
|
|
|
|
Impairment of TOO Ognevka
|
|
|
|
-
|
|
-
|
|
(1,679)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operating loss
|
|
|
|
(1,041)
|
|
(3,311)
|
|
(7,007)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Investment revenues
|
|
|
|
-
|
|
24
|
|
42
|
|
|
Other gains and losses
|
|
|
|
75
|
|
(77)
|
|
3
|
|
|
Finance costs
|
|
|
|
(109)
|
|
(51)
|
|
(101)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Loss before taxation
|
|
|
|
(1,075)
|
|
(3,415)
|
|
(7,063)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Taxation
|
|
|
|
(250)
|
|
(10)
|
|
(561)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Loss attributable to equity
shareholders
|
|
3
|
|
(1,325)
|
|
(3,425)
|
|
(7,624)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Loss per ordinary share
|
|
|
|
|
|
|
|
|
|
|
Basic
|
|
4
|
|
(0.28)р
|
|
(0.76)p
|
|
(1.65)p
|
|
|
Diluted
|
|
4
|
|
(0.28)р
|
|
(0.76)p
|
|
(1.65)p
|
|
Condensed group statement of recognised income and expense
Six month ended 30 June 2009
|
|
|
Six months to
30 June 2009
(unaudited)
£000
|
|
Six months to
30 June 2008
(unaudited)
£000
|
|
Year ended
31 December 2008
(audited)
£000
|
|
|
Currency translation differences on foreign
|
|
|
|
|
|
|
|
|
currency net investments
|
|
(4,183)
|
|
(28)
|
|
4,751
|
|
|
|
|
|
|
|
|
|
|
|
Net (loss) / profit recognised
|
|
|
|
|
|
|
|
|
directly in equity
|
|
(4,183)
|
|
(28)
|
|
4,751
|
|
|
|
|
|
|
|
|
|
|
|
Loss for the period
|
|
(1,325)
|
|
(3,425)
|
|
(7,624)
|
|
|
|
|
|
|
|
|
|
|
|
Total recognised expense for the period
|
|
|
|
|
|
|
|
|
attributable to equity shareholders
|
|
(5,508)
|
|
(3,453)
|
|
(2,873)
|
|
Condensed group balance sheet
30 June 2009
|
|
|
30 June 2009
(unaudited)
£000
|
|
30 June 2008
(unaudited)
£000
|
|
31 December 2008
(audited)
£000
|
|
|
Non-current assets
|
|
|
|
|
|
|
|
|
Property, plant and equipment
|
|
16,204
|
|
17,995
|
|
20,361
|
|
|
|
|
|
|
|
|
|
|
|
Current assets
|
|
|
|
|
|
|
|
|
Inventories
|
|
2,882
|
|
2,335
|
|
3,393
|
|
|
Trade and other receivables
|
|
1,468
|
|
1,559
|
|
1,638
|
|
|
Cash and cash equivalents
|
|
116
|
|
1,717
|
|
536
|
|
|
|
|
4,466
|
|
5,611
|
|
5,567
|
|
|
|
|
|
|
|
|
|
|
|
Total assets
|
|
20,670
|
|
23,606
|
|
25,928
|
|
|
|
|
|
|
|
|
|
|
|
Current liabilities
|
|
|
|
|
|
|
|
|
Trade and other payables
|
|
(1,455)
|
|
(1,121)
|
|
(1,626)
|
|
|
Provisions
|
|
(141)
|
|
(117)
|
|
(161)
|
|
|
Borrowings
|
|
(503)
|
|
-
|
|
(356)
|
|
|
|
|
(2,099)
|
|
(1,238)
|
|
(2,143)
|
|
|
|
|
|
|
|
|
|
|
|
Net current assets
|
|
2,367
|
|
4,373
|
|
3,424
|
|
|
|
|
|
|
|
|
|
|
|
Non-current liabilities
|
|
|
|
|
|
|
|
|
Trade and other payables
|
|
(629)
|
|
(575)
|
|
(629)
|
|
|
Deferred taxation
|
|
(811)
|
|
-
|
|
(561)
|
|
|
Provisions
|
|
(983)
|
|
(825)
|
|
(1,004)
|
|
|
|
|
(2,423)
|
|
(1,400)
|
|
(2,194)
|
|
|
|
|
|
|
|
|
|
|
|
Total liabilities
|
|
(4,522)
|
|
(2,638)
|
|
(4,337)
|
|
|
|
|
|
|
|
|
|
|
|
Net assets
|
|
16,148
|
|
20,968
|
|
21,591
|
|
|
|
|
|
|
|
|
|
|
|
Equity
|
|
|
|
|
|
|
|
|
Called-up share capital
|
|
469
|
|
469
|
|
469
|
|
|
Share premium
|
|
31,317
|
|
31,317
|
|
31,317
|
|
|
Merger reserve
|
|
(148)
|
|
(148)
|
|
(148)
|
|
|
Other reserves
|
|
236
|
|
127
|
|
170
|
|
|
Currency translation reserve
|
|
(480)
|
|
(1,150)
|
|
3,629
|
|
|
Accumulated losses
|
|
(15,246)
|
|
(9,647)
|
|
(13,846)
|
|
|
|
|
|
|
|
|
|
|
|
Total equity
|
|
16,148
|
|
20,968
|
|
21,591
|
|
Condensed group cash flow statement
Six months ended 30 June 2009
|
|
|
Six months to
30 June 2009
(unaudited)
£000
|
|
Six months to
30 June 2008
(unaudited)
£000
|
|
Year ended
31 December 2008
(audited)
£000
|
|
|
Net cash inflow/(outflow) from
|
|
|
|
|
|
|
|
|
operating activities
|
|
417
|
|
(3,064)
|
|
(3,895)
|
|
|
|
|
|
|
|
|
|
|
|
Investing activities
|
|
|
|
|
|
|
|
|
Interest received
|
|
-
|
|
26
|
|
42
|
|
|
Proceeds on disposal of property, plant and
|
|
|
|
|
|
|
|
|
equipment
|
|
-
|
|
-
|
|
61
|
|
|
Purchase of property, plant and equipment
|
|
(858)
|
|
(1,050)
|
|
(2,123)
|
|
|
|
|
|
|
|
|
|
|
|
Net cash used in investing activities
|
|
(858)
|
|
(1,024)
|
|
(2,020)
|
|
|
|
|
|
|
|
|
|
|
|
Financing activities
|
|
|
|
|
|
|
|
|
Proceeds on issue of shares
|
|
-
|
|
2,631
|
|
2,631
|
|
|
Interest paid
|
|
(51)
|
|
-
|
|
-
|
|
|
New bank loans raised
|
|
147
|
|
-
|
|
356
|
|
|
|
|
|
|
|
|
|
|
|
Net cash inflow from financing activities
|
|
96
|
|
2,631
|
|
2,987
|
|
|
|
|
|
|
|
|
|
|
|
Decrease in cash and
|
|
|
|
|
|
|
|
|
cash equivalents
|
|
(345)
|
|
(1,457)
|
|
(2,928)
|
|
|
|
|
|
|
|
|
|
|
|
Cash and cash equivalents
|
|
|
|
|
|
|
|
|
at beginning of the period
|
|
536
|
|
3,176
|
|
3,176
|
|
|
|
|
|
|
|
|
|
|
|
Effect of foreign exchange rate changes
|
|
(75)
|
|
(2)
|
|
288
|
|
|
|
|
|
|
|
|
|
|
|
Cash and cash equivalents at end
|
|
|
|
|
|
|
|
|
of the period
|
|
116
|
|
1,717
|
|
536
|
|
Notes to the interim condensed group financial statements
Six months ended 30 June 2009
1 General information
These interim group financial statements are for the six months ended 30
June 2009 and are unaudited. The information for the year ended 31
December 2008 does not constitute statutory accounts as defined in
Section 240 of the Companies Act 1985.
The financial information for the year ended 31 December 2008 has been
extracted from the statutory accounts of Hambledon Mining plc (“the
Group”) for that year that were prepared under United Kingdom Law and
International Financial Reporting Standards (IFRS) adopted by use by the
European Union. A copy of the statutory accounts for that year has been
delivered to the Registrar of Companies. The auditors’ report on those
accounts was unqualified, did not draw attention to any matters by way
of emphasis and did not contain any statement under Section 237(2) or
(3) of the Companies Act 1985.
2 Accounting policies
The interim group financial statements have been prepared using the
accounting policies set out in the statutory accounts for Hambledon
Mining plc for the year ended 31 December 2008. These accounting
policies comply with International Financial Reporting Standards (IFRS)
adopted by use by the European Union
3 Dividend
The directors do not recommend the payment of a dividend.
4 Loss per ordinary share
The calculation of basic and diluted earnings per share is based upon
the retained loss for the financial period.
The weighted average number of ordinary shares for calculating the basic
loss per share and diluted loss per share after adjusting for the
effects of all dilutive potential ordinary shares are as follows:
|
|
|
Six months to
30 June 2009
(unaudited)
|
|
Six months to
30 June 2008
(unaudited)
|
|
Year ended
31 December 2008
(audited)
|
|
|
|
|
|
|
|
|
|
|
|
Basic and diluted
|
|
469,189,233
|
|
452,737,597
|
|
461,031,025
|
|
5 Approval of interim group financial statements
The interim group financial statements for the six months to 30 June
2009 were approved by the directors on 16 September 2009.
