Print   

Thursday 16 July, 2009

Eastern Platinum

Drilling Report



FOR:  EASTERN PLATINUM LIMITED

TSX, AIM SYMBOL:  ELR
JSE SYMBOL:  EPS

July 16, 2009

Eastplats Reports Record Production for the Quarter Ended June 30, 2009

VANCOUVER, BRITISH COLUMBIA--(Marketwire - July 16, 2009) - Mr. Ian Rozier, President and CEO of Eastern
Platinum Limited ("Eastplats") (TSX:ELR)(AIM:ELR)(JSE:EPS), is pleased to report on production from the
Crocodile River Mine ("CRM") for the quarter ended June 30, 2009 ("Q2 2009").

The Company produced a quarterly record of 33,383 PGM ounces, up 1.3% compared to the quarter ended March 31,
2009, and up 10.1% compared to the quarter ended June 30, 2008.

Production statistics for the current quarter and historical quarters are as follows:

/T/

                                                                   Increase
                                Quarter ended                     (decrease)
                  ----------------------------------------- ---------------
                                                                 Q2      Q2
                                                            2009 vs 2009 vs
Production        June 30, Mar 31, Dec 31, Sept 30, June 30,     Q1      Q2
 statistics          2009    2009    2008     2008     2008    2009    2008
---------------------------------------------------------------------------
Ounces produced    33,383  32,969  29,015   30,755   30,314     414   3,069
---------------------------------------------------------------------------
Run-of-mine rock  342,368 321,165 280,933  319,462  305,134  21,203  37,234
 tonnes hoisted
---------------------------------------------------------------------------
Run-of-mine rock  304,354 318,394 298,514  305,490  313,767 (14,040) (9,414)
 tonnes processed
---------------------------------------------------------------------------
Development         4,326   4,573   4,604    5,599    5,575    (247) (1,249)
 (meters)
---------------------------------------------------------------------------
On-reef             2,860   2,745   2,922    3,556    3,230     115    (370)
 development
 (meters)
---------------------------------------------------------------------------
Stoping units      51,342  45,098  46,459   39,652   44,277   6,244   7,065
 (square meters)
---------------------------------------------------------------------------
Head grade            4.2     4.0     4.0      4.0      4.0     0.2     0.2
 (grams/tonne)
---------------------------------------------------------------------------
Concentrator           80%     80%     76%      78%      73%      0%     +7%
 recovery from ROM
 ore
---------------------------------------------------------------------------
Chrome produced    82,760  77,554  69,937   64,744   37,515   5,206  45,245
 (tonnes)
---------------------------------------------------------------------------

/T/

As at June 30, 2009, there were 35,104 tonnes of ROM stockpiles on surface.

During Q2 2009, tailings retreatment recommenced at CRM, with 135,935 tonnes of tailings processed in
addition to the ROM rock. There were 695 PGM ounces recovered from tailings during the quarter included in
the total production of 33,383 PGM ounces.

Development meters decreased, by 5.4% compared to the first quarter and by 22.4% compared to the quarter
ended June 30, 2008, as a result of changes to the mine plan implemented during the fourth quarter of 2008.

Stoping units increased by 13.8% compared to the first quarter as a result of stoping crew efficiencies and
additional stoping crews deployed to the Zandfontein section.

Concentrator recoveries have maintained a steady rate of 80% following the upgrades to the concentrator in
mid 2008. Head grade, which had remained constant at 4.0 grams/tonne throughout the past year, is up slightly
at 4.2 grams per tonne this quarter.

"We are pleased to report yet another quarterly production record of 33,383 ounces, which is a reflection of
the improved efficiencies in stoping development and in the processing operation and we plan to continue this
trend," said Ian Rozier.

Second quarter financial results and conference call

Eastplats is scheduled to release its full second quarter results on Thursday August 13, 2009 and host a
telephone conference call on the same day at 11:00 a.m. Pacific (2:00 p.m. Eastern) to discuss these results.
The conference call may be accessed by dialing 1-800-319-4610 in Canada and the United States, or 1-604-638-
5340 internationally.

The August 13, 2009 conference call will be archived for later playback until Thursday, August 20, 2009 and
can be accessed by dialing 604-638-9010 or 1-800-319-6413 and using the pass code 4219 followed by the number
sign.

The qualified person having reviewed the operating results presented in this press release is Mr. Brian
Montpellier, V.P. Project Development, P. Eng.

Total shares issued and outstanding: 680,557,369

Certain statements included herein constitute "forward-looking statements" within the meaning of applicable
Canadian securities legislation. These forward-looking statements are based on certain assumptions by
Eastplats and as such are not a guarantee of future performance. Actual results could differ materially from
those expressed or implied in such forward-looking statements due to factors such as general economic and
market conditions, increased costs of production and a decline in metal prices. Eastplats is under no
obligation to update or revise any forward-looking statements, whether as a result of new information, future
events or otherwise, except as required by applicable laws.

-30-

FOR FURTHER INFORMATION PLEASE CONTACT:

Eastern Platinum Limited
Investor Relations
1-(604)-685-6851
1-(604)-685-6493 (FAX)
info@eastplats.com
www.eastplats.com

OR

NOMAD - Canaccord Adams Limited
Ryan Gaffney
+44 20 7050 6500
Ryan.Gaffney@CanaccordAdams.com

OR

JSE SPONSOR - PSG Capital (Pty) Limited
Anje Gregory
+27 21 887 9602
anjeg@psgcapital.com

-0-

Eastern Platinum Limited								

						

Investegate takes no responsibility for the accuracy of the information within the site.


The announcements are supplied by the denoted source. Queries about the content of an announcement should be directed to the source. Investegate reserves the right to publish a filtered set of announcements. NAV, EMM/EPT, Rule 8 and FRN Variable Rate Fix announcements are filitered from this site.



Investegate      © 2012 FE. All rights reserved.