Print   

Friday 12 December, 2008

Lithic Metals&Energy

Additional Nickel Mineralisat

RNS Number : 0303K
Lithic Metals and Energy Limited
12 December 2008
 




Lithic Metals and Energy

('Lithic' or 'the Company')


Additional Nickel Mineralisation Identified, Togo


Highlights


  • Additional shallow nickel mineralisation from Kpoté prospect test pitting

  • Intersections include 4m @ 2.27% Ni, 12m @ 1.30% Ni, 7.4m @ 1.44% Ni and 10m @ 1.41% Ni

  • Additional nickel mineralisation encountered at nearby Mt Haito prospect


Lithic Metals and Energy (AIM:LMY) today announce analytical results from test pitting at its Kpoté and Haito nickel prospectsTogo.


The Company has now completed test pitting across the Kpoté hill prospect, where it has defined nickel mineralisation over a strike length in excess of 1.5 kilometres and open at depth. Elevated nickel values trend towards the north beneath a blanket of laterite cover, through which test pitting has proved ineffective due to depth of penetration limitations of the method.


At the nearby Mount Haito prospect, broadly-spaced test pitting has also encountered shallow nickel mineralisation over a 2 kilometre strike length.  Weathering of ultramafic lithology, the essential process required to enhance nickel values, appears to be less pronounced at Mount Haito than that observed at Kpoté, possibly explaining the typically lower nickel values encountered in pitting.


A table of significant pit intersections is presented below.


Commenting on these results, Lithic Managing Director Jim Kerr said 'The results from this batch of test pitting that concluded in August, builds on the positive nickel values generated from earlier pitting at Kpoté and Haito.  We look forward to results of an additional regional test pitting programme already completed on other prospective nickel targets within the project area.  We aim to demonstrate the widespread nature of nickel saprolite mineralisation across a number of prospects at the Haito project.'


For more information, please visit our website www.lithicme.com



Jim Kerr, Lithic Metals & Energy 

Tel: +61 8 9322 5804 

David Youngman / Katy Mitchell, WH Ireland Limited 

Tel: +44 (0)161 832 2714 

Laurence Read / Beth Harris, Threadneedle Communications 

Tel: +44 (0)20 7653 9850 


  Table 1: Kpoté and Haito Prospect Test Pitting Intersections

Pit

Number

Total

Depth

UTM EAST

(Zone 31N)

UTM NORTH

(Zone 31N)

RL

Intersections


Nickel %

Co (ppm)

Kpoté Test Pits

HKP050

10.2m

268,868

801,014

416

6m @ 0.55% Ni from 4.2m

260


HKP051

4.7m

268,375

801,231

506

4.7m @ 2.27% Ni from 0m

including 3m @ 3.12% Ni

256

*

HKP052

7.6m

268,353

801,313

478

7.6m @ 0.60% Ni from 0m

127

*

HKP053

7.3m

268,448

801,314

503

5m @ 0.67% Ni from 1.3m

96


HKP054

2m

268,451

801,238

512

No significant results



HKP055

12.2m

268,059

800,674

477

No significant results



HKP056

6m

268,212

801,056

507

6m @ 0.81% Ni from 0m

313

*

HKP057

10.9

268,891

801,789

384

No significant results



HKP058

3.8m

268,068

801,058

475

2m @ 0.67% Ni from 1.8m

410

*

HKP059

5.5m

269,191

801,481

383

No significant results



HKP060

8.9m

269,119

801,861

372

4m @ 0.90% Ni from 2.9m

873


HKP061

8.3m

269,251

801,698

372

3m @ 0.84% Ni from 5.3m

830

*

HKP062

9.2m

268,732

800,891

426

No significant results



HKP063

11.5m

267,905

801,034

452

4.5m @ 0.57% Ni from 0m

191


HKP064

5m

269,233

801,970

366

2m @ 0.67% Ni from 1m

810


HKP065

6m

269,323

801,769

369

No significant results



HKP066

5.2m

267,776

800,908

425

No significant results



HKP067

9.8m

267,912

800,904

485

3m @ 0.61% Ni from 3.8m

213

*

HKP068

1.2m

269,480

802,140

356

No significant results



HKP069

11.8m

268,052

800,800

507

9m @ 0.82% Ni from 1.8m

837


HKP070

9.8m

267,857

800,578

406

No significant results



HKP071

12m

268,110

800,610

459

12m @ 1.30% Ni from 0m

233

*

HKP072

11m

268,205

800,812

495

7m @ 1.03% Ni from 4m

257

*

HKP073

12m

268,581

801,390

502

12m @ 1.14% Ni from 0m

1,732

*

HKP074

12m

268,672

801,380

499

12m @ 0.82% Ni from 0m

188

*

HKP075

7.6m

268,765

801,475

470

No significant results



HKP076

7.6m

268,179

801,175

462

5.6m @ 0.96% Ni from 0m

356


HKP077

5.8m

268,368

801,066

513

4m @ 0.73% Ni from 1.8m

605

*

HKP078

12m

268,396

801,183

515

11m @ 1.06% Ni from 1m

2,495

*

HKP079

12m

268,262

801,090

506

12m @ 1.08% Ni from 0m

598

*

Haito Test Pits

HHP007

8

274,399

796,530

285

3m @ 0.58% Ni from 3m

520


HHP008

6.2

274,600

796,529

279

1m @ 0.55% Ni from 2.2m

590


HHP009

4

274,600

796,929

277

No significant results 

170


HHP010

4.8

274,059

798,151

459

1m @ 0.53% Ni from 1m 

185

*

HHP011

4

273,958

798,153

475

4m @ 0.62% Ni from 0m 

293

*

HHP012

12.2

273,962

798,251

495

12.2m @ 0.72% Ni from 0m 

250

*

HHP013

6

273,956

798,353

492

6m @ 0.64% Ni from 0m 

425

*

HHP014

12

274,056

798,356

482

12m @ 0.76% Ni from 0m 

192

*

HHP015

5.9

274,068

798,255

473

5m @ 0.79% Ni from 0.9m 

178


HHP016

11.5

274,059

798,054

442

4m @ 0.68% Ni from 1.5m 

2m @ 0.71% Ni from 9.5m

170

155


*

HHP017

4.9

273,961

798,055

440

3.9m @ 0.96% Ni from 0m

143


HHP018

9.5

274,150

797,900

364

2.25m @ 0.56% Ni from 1.25m

176


HHP019

3.1

273,940

797,898

400

No significant results



HHP020

1.8

273,747

797,899

431

No significant results



HHP021

3.5

273,551

797,899

416

No significant results



HHP022

12

274,150

797,900

364

5m @ 0.63% Ni from 0m

194


HHP023

2.3

273,948

797,715

402

2.3m @ 0.61% Ni from 0m

157

*

HHP024

3

273,761

797,730

399

No significant results



HHP025

5.8

274,150

797,731

340

2.8m @ 0.56% Ni from 0m

164


HHP026

8.5

274,603

797,329

294

No significant results



HHP027

11.6

274,404

797,333

297

1m @ 0.73% Ni from 0.6m

510


HHP028

6.2

274,203

797,331

301

1.2m @ 0.68% Ni from 0m

500


HHP029

10.7

274,003

797,329

304

8.7m @ 0.70% Ni from 0m

253


HHP030

9.6

273,800

797,330

306

5.6m @ 0.75% Ni from 0m

422

*

HHP031

6

273,600

797,330

306

1m @ 0.62% Ni from 2m

400


HHP032

4.35

273,400

797,330

308

1m @ 0.61% Ni from 1.35m

710


HHP033

5.75

273,200

797,330

319

1m @ 0.78% Ni from 0m

810


*Denotes pitting ended in >0.5% Ni grades


Notes:

1.  Nickel analyses completed by ALS laboratories PerthWestern Australia by ME XRF-12 borate flux method.

2.  Intercepts calculated as a weighted average using >0.5% Ni values and a maximum of 2m internal waste, minimum width 1m

3.  Cobalt values reported as a weighted average value over the corresponding reported nickel intersection.


The information in this report that relates to Exploration Results is based on information compiled by Managing Director Jim Kerr (BSc Geol, MSc Min Econ, MSEG). Mr Kerr, a full-time employee of Lithic Metals and Energy is a Member of the Australasian Institute of Mining and Metallurgy and is a Competent Person as defined in the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Kerr consents to the circulation and inclusion in the report of the matters based on the information in the form and context in which it appears.



This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEAEAAFEAPFFE

Investegate takes no responsibility for the accuracy of the information within the site.


The announcements are supplied by the denoted source. Queries about the content of an announcement should be directed to the source. Investegate reserves the right to publish a filtered set of announcements. NAV, EMM/EPT, Rule 8 and FRN Variable Rate Fix announcements are filitered from this site.



Investegate      © 2012 FE. All rights reserved.