Print   

Friday 22 February, 2008

Persian Gold PLC

Drilling Report

Persian Gold PLC
22 February 2008


                               Persian Gold plc.

22nd February 2008
                             Dalli Drilling Results

Highlights
     
O    Continued positive results from Dalli

O    Positive results indicate need for more drilling

O    Deeper drilling necessary to establish the extent of copper-gold discovery

Persian Gold (AIM:PNG), the Irish based Iranian gold explorer, is pleased to
announce a summary of all drill hole results from its porphyry gold-copper
project at Dalli, 300km southwest of Tehran. Gold and copper results for holes
DDH-1 through DDH-3 have previously been reported.
                                                            

Drill Hole #                Depth (m)       Interval (m)               Gold             Copper

DDH-1
(South Hill)                    0-211                211           0.68 g/t              0.45%
Including                       44-90                 46           0.84 g/t              0.77%
and                           197-211                 14           1.50 g/t              1.27%

DDH-2                           
(South Hill)                    0-213                213           0.75 g/t              0.57%
Including                       16-82                 66           1.28 g/t              1.08%

DDH-3                           0-233                233           0.52 g/t              0.12%
(North Hill)
Including                       46-86                 40           0.69 g/t              0.17%

DDH-4                            0-28                 28           0.60 g/t              0.12%
(North Hill)
and                           217-316                100           0.53 g/t              0.17%


This four-hole effort represents the Phase 1 drilling program at Dalli and, due
to the significant mineralisation encountered, plans are now being finalised for
the initiation of the second phase of drilling.  The South Hill target and the
North Hill target are interpreted to represent porphyry centres located
approximately 1.5km apart.  These two mineralised zones are aligned along a
northeast-southwest trending structural zone.  It is clear that the strong gold
grades in the South Hill continue in the North Hill.  The similarity of copper
and gold grades in both the South Hill and the North Hill complexes suggests the
strength of these porphyry systems and necessitates further exploration.

A Phase 2 follow-up drilling programme will be undertaken shortly to gather
additional information relating to the size, grade, depth and lateral extent of
mineralisation both around and between the North and South Hills.

A surface IP (Induced Polarisation) geophysical survey has been completed over
both the South and North Hill porphyries. The survey consisted of six profiles
for a total length of 2.64km. This IP survey has defined potential extensions to
the zone of conductive sulphides, which correlate with the intercepts seen in
the drilling.  The combined results are being utilised in the planning of the
next phase of drilling at Dalli.

The drilling programme in the South Hill will involve one vertical hole down the
centre of the system to measure the depth extent of the higher grades seen to
date and one steep angle hole drilled eastwards across the projected southern
extension system where an IP line gave a very favourable response.  In the North
Hill area, two additional holes will be drilled targeting the extension of
higher gold and copper grades.

For comparison purposes, two of the largest porphyry copper deposits in Iran,
Sarcheshmeh and Sungun, have copper grades only slightly higher than that of
Dalli's South Hill system.  The copper grade of Sarcheshmeh is approximately
0.7% and that of Sungun is 0.75% with only minor by-product gold for each.  The
gold grade recorded from the initial four holes at Dalli, ranging from 0.5 g/t
to 1.2 g/t, is significantly higher than that of either Sarcheshmeh or Sungun.

John Teeling, Chairman of Persian Gold, commented;

'These results are timed well to coincide with the end of the snow at Dalli. The
gold copper porphyry system being outlined at Dalli is typical of this type of
resource where a rule of thumb cut-off grade is 0.5g/t gold and 0.5% copper. We
have good gold grades in all four holes and acceptable copper grades in the
South Hill. We now need to test the size of this resource at depth.'

Persian Gold plc has made two mineral discoveries in Iran since listing on AIM
in June 2005.  The Company is evaluating the potential for a gold mine at its
Chah-e-Zard discovery and is evaluating the size of the newly discovered Dalli
gold-copper deposit.

Information in this announcement relating to exploration results has been
reviewed by Mr. A. Babakhani, an independent geologist and consultant to Persian
Gold, who is a qualified person under AIM guidelines.


Contacts:
 Persian Gold Plc
 John Teeling                                          +353 1 833 2833

 College Hill
 Paddy Blewer                                          +44 (0) 20 7457 2020
 Nick Elwes                                            +44 (0) 20 7457 2020

 Blue Oar Securities Plc
 John Wakefield                                        +44 (0) 117 933 0020
 Simon Moynagh                                         +44 (0) 117 933 0020

                             www.persiangoldplc.com


                      This information is provided by RNS
            The company news service from the London Stock Exchange

Investegate takes no responsibility for the accuracy of the information within the site.


The announcements are supplied by the denoted source. Queries about the content of an announcement should be directed to the source. Investegate reserves the right to publish a filtered set of announcements. NAV, EMM/EPT, Rule 8 and FRN Variable Rate Fix announcements are filitered from this site.



Investegate      © 2012 FE. All rights reserved.